MFM 204 Project Management Notes for GGSIPU MBA (FM) Sem 4

Programme
Master of Business Administration

MFM 204 Project Management Notes cover all four units of the GGSIPU MBA (Financial Management) Semester 4 core paper. The English printed book is listed as 54 pages and includes 21 worked numerical illustrations, 12 solved exam questions, 46 practice questions and 9 diagrams. Topics include project identification, demand forecasting, project costing and financing, NPV, IRR, risk analysis, CPM, PERT, project crashing and review. The notes follow the MBA (FM) scheme labelled 2021-22 onwards and are available as a printed book ordered through WhatsApp.

Written by Prateek Talwar, Founder, Unnati Educations · Reviewed by Prateek Talwar · Checked against the MBA (Financial Management) Scheme and Syllabus, 2021-22 onwards · Updated 14 October 2026 · Editorial policy

Scheme: MBA (FM) 2021-22 onwards | Applies to: batches admitted from 2021-22 onwards, subject to subsequent revisions | Source record last verified: 14 October 2026

MFM 204 Project Management at a glance: GGSIPU MBA (FM) Sem 4 credits, units and exam pattern

MFM 204 is a three-credit core paper in Semester 4 of the MBA (Financial Management) programme. It covers project identification, market and technical analysis, investment appraisal, project scheduling and implementation.

MFM 204 Project Management: scheme facts from the supplied GGSIPU MBA (FM) syllabus mapping

Code and title

MFM 204 · Project Management (shown as MFM-204 in the syllabus)

Course and semester

MBA (Financial Management), Semester 4

Category and credits

Core paper; 3 credits; L-3, T-0, P-0

Marks

100: 25 internal + 75 end-term

Pass mark

Not specified in the supplied scheme details; consult GGSIPU Ordinance 11 and applicable examination notifications

Applies to

Batches covered by the MBA (FM) scheme labelled 2021-22 onwards

End-term pattern

75 marks; detailed question-paper pattern not confirmed in the supplied scheme details

Units and hours

4 units, 42 teaching hours: 10 + 10 + 10 + 12

Paired lab

None

View complete table: MFM 204 Project Management: scheme facts from the supplied GGSIPU MBA (FM) syllabus mapping

This view preserves the original alignment. Scroll within it if needed to read the complete content.

MFM 204 Project Management: scheme facts from the supplied GGSIPU MBA (FM) syllabus mapping

Code and title

MFM 204 · Project Management (shown as MFM-204 in the syllabus)

Course and semester

MBA (Financial Management), Semester 4

Category and credits

Core paper; 3 credits; L-3, T-0, P-0

Marks

100: 25 internal + 75 end-term

Pass mark

Not specified in the supplied scheme details; consult GGSIPU Ordinance 11 and applicable examination notifications

Applies to

Batches covered by the MBA (FM) scheme labelled 2021-22 onwards

End-term pattern

75 marks; detailed question-paper pattern not confirmed in the supplied scheme details

Units and hours

4 units, 42 teaching hours: 10 + 10 + 10 + 12

Paired lab

None

Unit 4 has the largest teaching-hour allocation, at 12 hours, and includes CPM, PERT, crashing, project control and implementation. The supplied scheme identifies MFM 204 as the only core theory paper in Semester 4. The semester also includes a project dissertation and elective papers, totalling 21 credits in the source's scheme summary.

Official reference: GGSIPU MBA (Financial Management) Scheme and Syllabus, 2021-22 onwards. The supplied source identifies the Semester 4 scheme on PDF page 8 and the MFM 204 syllabus on pages 72–73.

MFM 204 Project Management Notes unit-wise: 21 worked numericals across 4 units

The supplied book plan allocates pages 4–53 to the four units, following three introductory pages. Each unit includes worked illustrations, solved exam questions and additional practice questions.

MFM 204 Unit 1: Project Identification Analysis

Unit 1 (pages 4 to 13) introduces projects as capital investments. It covers the need for capital investment, six purpose-based project types, six phases of capital budgeting, corporate appraisal, environmental monitoring and the identification of investment opportunities.

The unit explains 13 sources for scouting project ideas, SWOT analysis, a six-filter project screening process and the Project Rating Index.

Unit content: 1 worked illustration, 3 figures, 3 solved questions and 10 practice questions.

Quick look: Project Rating Index for solar water heaters (from page 12)

Selected factors and the final Project Rating Index result

Factor

Weight

Rating (1–5)

Weighted score

Market potential

0.25

4

1.00

Competition and risk

0.20

2

0.40

All six factors combined

1.00

—

3.45

Selected factors and the final Project Rating Index result

Factor

Market potential

Weight

0.25

Rating (1–5)

4

Weighted score

1.00

Factor

Competition and risk

Weight

0.20

Rating (1–5)

2

Weighted score

0.40

Factor

All six factors combined

Weight

1.00

Rating (1–5)

—

Weighted score

3.45

The overall Project Rating Index is 3.45, above the illustrative acceptance cut-off of 3.00. The remaining four individual factor ratings are not supplied in the page extract, so the total should be read as the source's reported result rather than independently reconstructed from the two displayed rows.

MFM 204 Unit 2: Market and Technical Analysis, Project Costing and Finance

Unit 2 (pages 14 to 28) examines the six steps of market and demand analysis, sample surveys and three families of demand forecasting methods. It also considers forecasting uncertainty.

Technical analysis covers product mix, plant capacity, materials, inputs and machinery. These decisions feed into the cost of a project, cost of production, means of financing, taxation aspects and the role of financial institutions such as SIDBI.

Unit content: 5 worked illustrations, 2 figures, 3 solved questions and 12 practice questions.

Quick look: break-even analysis for a 50,000-unit plant (from page 23)

Break-even point and margin of safety

Measure

Working

Result

Contribution per unit

₹500 − ₹300

₹200

P/V ratio

₹200 ÷ ₹500 × 100

40%

Break-even point

₹60,00,000 ÷ ₹200

30,000 units

Break-even capacity utilisation

30,000 ÷ 50,000 × 100

60%

Margin of safety

45,000 − 30,000

15,000 units

Margin of safety percentage

15,000 ÷ 45,000 × 100

33.33% of actual sales volume

Break-even point and margin of safety

Measure

Contribution per unit

Working

₹500 − ₹300

Result

₹200

Measure

P/V ratio

Working

₹200 ÷ ₹500 × 100

Result

40%

Measure

Break-even point

Working

₹60,00,000 ÷ ₹200

Result

30,000 units

Measure

Break-even capacity utilisation

Working

30,000 ÷ 50,000 × 100

Result

60%

Measure

Margin of safety

Working

45,000 − 30,000

Result

15,000 units

Measure

Margin of safety percentage

Working

15,000 ÷ 45,000 × 100

Result

33.33% of actual sales volume

The example assumes constant selling price, variable cost per unit and fixed costs over the relevant activity range.

MFM 204 Unit 3: Project Appraisal and Risk Analysis

Unit 3 (pages 29 to 41) is the most calculation-intensive unit. The source uses a recurring project with an initial investment of ₹1,00,000 and a 10% cost of capital to demonstrate payback, accounting rate of return (ARR), net present value (NPV), internal rate of return (IRR), benefit-cost ratio and modified internal rate of return (MIRR).

It also compares UNIDO and Little-Mirrlees approaches to social cost-benefit analysis, explains risk-adjusted discount rates, certainty equivalents, sensitivity analysis and decision trees, and introduces the weighted average cost of capital (WACC).

Unit content: 11 worked illustrations, 1 figure, 3 solved questions and 12 practice questions.

Quick look: computing WACC (from page 39)

Weighted average cost of capital for the illustrative financing mix

Source of capital

Weight

Relevant cost

Weighted contribution

Equity: ₹50 lakh

0.50

16.0%

8.00%

Preference capital: ₹10 lakh

0.10

12.0%

1.20%

Debt: ₹40 lakh, 10% before tax

0.40

7.5% after 25% tax adjustment

3.00%

Total

1.00

—

12.20%

Weighted average cost of capital for the illustrative financing mix

Source of capital

Equity: ₹50 lakh

Weight

0.50

Relevant cost

16.0%

Weighted contribution

8.00%

Source of capital

Preference capital: ₹10 lakh

Weight

0.10

Relevant cost

12.0%

Weighted contribution

1.20%

Source of capital

Debt: ₹40 lakh, 10% before tax

Weight

0.40

Relevant cost

7.5% after 25% tax adjustment

Weighted contribution

3.00%

Source of capital

Total

Weight

1.00

Relevant cost

—

Weighted contribution

12.20%

WACC = (0.50 × 16%) + (0.10 × 12%) + (0.40 × 7.5%) = 12.20%. This example assumes the stated weights and capital costs are appropriate for the project and that the debt interest tax shield is available.

MFM 204 Unit 4: Network Techniques, Project Management and Review

Unit 4 (pages 42 to 53) covers project scheduling through Critical Path Method (CPM) and Programme Evaluation and Review Technique (PERT). The source uses a seven-activity network for forward and backward passes, float calculations, critical-path identification and completion probability.

The unit also explains project crashing, network updating, resource allocation and levelling, earned value control, forms of project organisation, human aspects, implementation prerequisites and post-implementation project review.

Unit content: 4 worked illustrations, 3 figures, 3 solved questions and 12 practice questions.

Quick look: project crashing with indirect cost of ₹1,200 per day (from page 47)

Illustrative crashing options and total project cost

Step

Crashing action

Project duration

Total cost

0

Normal schedule

11 days

₹30,200

1

Crash activity C by one day at ₹500 additional direct cost

10 days

₹29,500

2

Further crashing involving activities C and B; ₹1,500 additional direct cost at this step

9 days

₹29,800

Illustrative crashing options and total project cost

Step

0

Crashing action

Normal schedule

Project duration

11 days

Total cost

₹30,200

Step

1

Crashing action

Crash activity C by one day at ₹500 additional direct cost

Project duration

10 days

Total cost

₹29,500

Step

2

Crashing action

Further crashing involving activities C and B; ₹1,500 additional direct cost at this step

Project duration

9 days

Total cost

₹29,800

In the supplied illustration, the 10-day schedule has the lowest total cost among the three alternatives shown. The saving from reducing one day of indirect cost exceeds the additional direct cost in the first step, but not in the next. A complete optimisation must also account for changes to the critical path and all feasible crashing alternatives.

MFM 204 exam corner: 7 two-and-a-half-mark and 5 five-mark solved questions by unit

MFM 204 solved questions, practice questions and worked illustrations

Unit

Solved: 2.5 marks

Solved: 5 marks

Practice: short / long

Worked illustrations

Unit 1

2

1

5 / 5

1

Unit 2

2

1

6 / 6

5

Unit 3

1

2

6 / 6

11

Unit 4

2

1

6 / 6

4

Total

7

5

23 / 23

21

MFM 204 solved questions, practice questions and worked illustrations

Unit

Unit 1

Solved: 2.5 marks

2

Solved: 5 marks

1

Practice: short / long

5 / 5

Worked illustrations

1

Unit

Unit 2

Solved: 2.5 marks

2

Solved: 5 marks

1

Practice: short / long

6 / 6

Worked illustrations

5

Unit

Unit 3

Solved: 2.5 marks

1

Solved: 5 marks

2

Practice: short / long

6 / 6

Worked illustrations

11

Unit

Unit 4

Solved: 2.5 marks

2

Solved: 5 marks

1

Practice: short / long

6 / 6

Worked illustrations

4

Unit

Total

Solved: 2.5 marks

7

Solved: 5 marks

5

Practice: short / long

23 / 23

Worked illustrations

21

The notes include 12 solved questions: 7 labelled as 2.5-mark questions and 5 labelled as 5-mark questions. They also provide 46 additional practice questions without answers, split equally into 23 short and 23 long questions, plus 21 worked numerical illustrations. These marks labels describe the notes' editorial format, not a confirmed official question-paper pattern.

One question per unit, with answer pointers:

  1. Unit 1: Distinguish between mutually exclusive and contingent projects. Pointer: Selecting one mutually exclusive project rules out another, while a contingent project depends on the selection or implementation of another project.

  2. Unit 2: What is margin money for working capital? Pointer: Explain the portion of working capital that must be financed from the borrower's own or other eligible long-term sources rather than the bank's working-capital facility.

  3. Unit 3: Why is NPV generally preferred to IRR? Pointer: Explain NPV's value-additivity, consistency with the required return and its usefulness when comparing mutually exclusive investments; discuss possible multiple-IRR and ranking problems.

  4. Unit 4: What is project crashing, and when should it stop? Pointer: Describe shortening critical activities at additional direct cost. Compare the incremental crashing cost with time-related savings while checking whether the critical path changes.

The separate MFM 204 important-questions page is planned, but its publication is not confirmed in the supplied source.

Who writes and checks the MFM 204 Project Management notes?

  • Prateek Talwar, author: Founder, Unnati Educations; Associate Company Secretary (ACS), ICSI, membership no. 58704, since 15 May 2019; B.Com, University of Delhi (School of Open Learning), 2012. Author profile

Prateek Talwar is also identified as the subject reviewer. The supplied editorial record states that the 2026–27 edition was checked against the MFM 204 syllabus on pages 72–73 of the MBA (FM) scheme and includes the four prescribed units plus project review.

Last updated and last recorded verification: 14 October 2026. Read the editorial policy.

How to write MFM 204 answers: appraisal numericals, network solutions and five-mark theory answers

For descriptive questions, the notes recommend beginning with a clear definition followed by four or five relevant points. For numerical questions, show the formula, substitution, intermediate calculations and decision.

  • Project identification: Explain the screening criteria and ensure Project Rating Index weights sum to 1.

  • Demand forecasting: Identify the method, assumptions and possible sources of forecast error.

  • Capital budgeting: Present cash flows consistently and distinguish NPV, IRR, payback and ARR decision rules.

  • CPM: Draw the network, calculate earliest and latest event or activity times, prepare a float table and identify the critical path.

  • PERT: Show expected activity times, variance calculations, project variance and the completion probability under the stated approximation.

Worked example: IRR by interpolation (page 32)

The supplied illustration gives an NPV of +₹825 at a discount rate of 16% and an NPV of −₹1,335 at 17%.

  1. Lower trial rate: 16%, with positive NPV of ₹825.

  2. Upper trial rate: 17%, with negative NPV of ₹1,335.

  3. Interpolation formula: IRR ≈ Lower rate + [Positive NPV / (Positive NPV + absolute Negative NPV)] × Rate interval.

  4. Substitution: 16% + [825 / (825 + 1,335)] × 1%.

  5. Estimated IRR: 16.38%.

  6. Decision: At the example's 10% cost of capital, the project meets the IRR acceptance criterion, assuming a conventional cash-flow pattern.

Interpolation provides an approximation. For non-conventional cash flows, IRR may be ambiguous, so NPV and the full cash-flow profile should also be examined.

The notes also use the memory hooks P-A-S-F-I-R for capital budgeting phases and D-M-E for forecasting error, as described in the supplied source.

MFM 204 and the GGSIPU MBA (FM) Sem 4 papers it connects to

Paired lab: None. MFM 204 is a core theory paper with no separately identified practical component.

The supplied Semester 4 scheme summary lists MFM 202 Project Dissertation at six credits, MFM 204 Project Management at three credits and four three-credit electives, giving 21 credits altogether.

  • MFM 202 Project Dissertation: Unit 2 market surveys, questionnaire design and project planning support dissertation work.

  • MFM 206 Business Valuation: Unit 3 discounting, cash-flow appraisal and WACC connect with discounted cash-flow valuation.

  • MFM 208 Risk Management and Insurance: Unit 3 project-risk analysis provides a foundation for identifying and measuring financial risks.

The source identifies the Semester 4 elective range as MFM 206 Business Valuation to MFM 218. Students should confirm the electives actually offered under their institute's applicable scheme.

Forms of project organisation in project management: excerpt from page 49 of the MFM 204 notes

Excerpt from page 49, Unit 4: Network Techniques, Project Management and Review; adapted for the web

Understanding project organisation

Project organisation determines how authority, responsibility, communication and resources are arranged during project implementation. The notes describe four organisational forms, each offering a different balance of project authority and functional specialisation.

1. Line and staff (functional) organisation

The project operates within existing functional departments. A project coordinator links the departments but has limited direct authority.

Advantage: Existing technical expertise and resources can be used efficiently. Limitation: Coordination may be weak because no single project manager has complete control. It is suitable for relatively small and simple projects.

2. Divisional organisation

A separate division is established for the project, with its head controlling project activities.

Advantage: Responsibility and accountability are clearer. Limitation: Similar resources may be duplicated across divisions.

3. Matrix organisation

A matrix combines functional and project structures. Team members may report to a functional manager for technical work and to a project manager for project delivery. Depending on the balance of authority, the structure may be weak, balanced or strong.

Advantage: Specialist resources can be shared across projects. Limitation: Dual reporting may cause conflicting instructions or disputes over priorities.

4. Pure project (projectised) organisation

A dedicated team works full time under a project manager with substantial authority over resources and decisions.

Advantage: Clear leadership and faster decision-making. Limitation: Higher resource costs, duplication and possible uncertainty about team members' assignments after completion. It is suited to large, complex or urgent projects.

Comparison of functional, matrix and pure project organisation

Basis

Functional

Matrix

Pure project

Project manager authority

Little or limited

Shared; varies by matrix type

High

Staff allocation

Generally part time

Part time or full time

Dedicated full time

Resource use

Shared functional resources

Resources shared across projects and departments

Dedicated project resources

Main challenge

Coordination and divided priorities

Dual reporting and authority conflicts

Cost and resource duplication

Typical suitability

Small, straightforward projects

Several medium or cross-functional projects

Large, complex or urgent projects

Comparison of functional, matrix and pure project organisation

Basis

Project manager authority

Functional

Little or limited

Matrix

Shared; varies by matrix type

Pure project

High

Basis

Staff allocation

Functional

Generally part time

Matrix

Part time or full time

Pure project

Dedicated full time

Basis

Resource use

Functional

Shared functional resources

Matrix

Resources shared across projects and departments

Pure project

Dedicated project resources

Basis

Main challenge

Functional

Coordination and divided priorities

Matrix

Dual reporting and authority conflicts

Pure project

Cost and resource duplication

Basis

Typical suitability

Functional

Small, straightforward projects

Matrix

Several medium or cross-functional projects

Pure project

Large, complex or urgent projects

The most appropriate structure depends on project size, urgency, complexity, available resources and the degree of coordination required.

Do the MFM 204 notes cover the full GGSIPU syllabus?

The supplied editorial mapping identifies content for all four prescribed MFM 204 units. It also describes a project-review section beyond the topics explicitly listed in the source's syllabus summary. This is a source-based coverage assessment, not an independent page-by-page inspection of the finished printed book.

MFM 204 official syllabus topics mapped to the supplied notes

Official unit

Syllabus topics

Mapped notes pages

Status

I: Project Identification Analysis (10 hours)

Capital investment, project types, capital budgeting phases, corporate appraisal, environmental monitoring, investment opportunities, idea scouting and project rating

Topic mapping pages 5–12; unit extends from page 4 to page 13

Mapped in source

II: Market and Technical Analysis, Project Costing and Finance (10 hours)

Market surveys, demand forecasting, forecasting uncertainty, technical analysis, project and production costs, break-even analysis, financing, taxation and financial institutions

Topic mapping pages 14–27; unit extends to page 28

Mapped in source

III: Project Appraisal and Risk Analysis (10 hours)

Time value of money, payback, ARR, NPV, IRR, benefit-cost ratio, social cost-benefit analysis, effective rate of return, risk-analysis techniques and WACC

Topic mapping pages 29–40; unit extends to page 41

Mapped in source; effective rate of return interpreted as MIRR in the notes

IV: Network Techniques, Project Management and Review (12 hours)

CPM, PERT, floats, crashing, network contraction, updating, resource allocation, project organisation, planning, control, human aspects and implementation prerequisites

Topic mapping pages 42–52; unit extends to page 53

Mapped in source

MFM 204 official syllabus topics mapped to the supplied notes

Official unit

I: Project Identification Analysis (10 hours)

Syllabus topics

Capital investment, project types, capital budgeting phases, corporate appraisal, environmental monitoring, investment opportunities, idea scouting and project rating

Mapped notes pages

Topic mapping pages 5–12; unit extends from page 4 to page 13

Status

Mapped in source

Official unit

II: Market and Technical Analysis, Project Costing and Finance (10 hours)

Syllabus topics

Market surveys, demand forecasting, forecasting uncertainty, technical analysis, project and production costs, break-even analysis, financing, taxation and financial institutions

Mapped notes pages

Topic mapping pages 14–27; unit extends to page 28

Status

Mapped in source

Official unit

III: Project Appraisal and Risk Analysis (10 hours)

Syllabus topics

Time value of money, payback, ARR, NPV, IRR, benefit-cost ratio, social cost-benefit analysis, effective rate of return, risk-analysis techniques and WACC

Mapped notes pages

Topic mapping pages 29–40; unit extends to page 41

Status

Mapped in source; effective rate of return interpreted as MIRR in the notes

Official unit

IV: Network Techniques, Project Management and Review (12 hours)

Syllabus topics

CPM, PERT, floats, crashing, network contraction, updating, resource allocation, project organisation, planning, control, human aspects and implementation prerequisites

Mapped notes pages

Topic mapping pages 42–52; unit extends to page 53

Status

Mapped in source

The source notes that the syllabus uses the term "Effective Rate of Return", while the book explains it through modified internal rate of return (MIRR). This terminology should be confirmed against the official syllabus and the intended calculation method.

Official reference: GGSIPU MBA (Financial Management) Scheme and Syllabus, 2021-22 onwards, identified in the source as pages 72–73 for MFM 204.

MFM 204 Project Management notes FAQs

How do I get the full MFM 204 notes?

Order through the WhatsApp button below. The complete notes are listed as a 54-page English printed book, not a full downloadable PDF. A free webpage summary is available, and a sample PDF is planned. Delivery is within 5 to 7 days at most, depending on location.

How is MFM 204 Project Management marked, and what is the passing mark?

MFM 204 carries 100 marks: 25 internal and 75 end-term. The supplied scheme summary divides internal assessment into a 15-mark class test and 10 marks for assignments or participation. It does not specify a passing percentage for the paper. Consult GGSIPU Ordinance 11 and applicable examination notifications for current rules.

Which MFM 204 unit has the most numericals?

Unit 3, Project Appraisal and Risk Analysis, contains 11 of the book's 21 worked illustrations. Unit 2 contains five, Unit 4 contains four and Unit 1 contains one. Unit 3 compares investment appraisal methods using a recurring ₹1,00,000 project example.

Is MFM 204 a core paper, and how many credits does it carry?

Yes. Under the supplied MBA (FM) Semester 4 scheme, MFM 204 is a three-credit core paper with three lecture hours per week and 42 allocated teaching hours. The source's semester summary also lists a six-credit dissertation and four three-credit electives, giving 21 credits in total.

Do the MFM 204 notes solve CPM and PERT on a full network?

Yes. The source describes a seven-activity network solved using CPM and PERT. The CPM solution includes forward and backward passes, float calculations and a reported critical path A–C–F lasting 13 days. The PERT version gives a project standard deviation of 1.374 days and a reported probability of approximately 92.8% of completion within 15 days, under the normal approximation used in the illustration.

Which textbook do the MFM 204 notes follow?

The supplied editorial record identifies Prasanna Chandra's Projects: Planning, Analysis, Selection, Financing, Implementation and Review as a principal reference named in the official syllabus. The notes cover capital budgeting, project identification, implementation and worked CPM, PERT and crashing calculations.

Get the full MFM 204 Project Management Notes on WhatsApp

The English printed book is listed as 54 pages with 21 worked numerical illustrations, 12 solved exam questions, 46 practice questions and 9 diagrams.

MFM 204 printed notes: page allocation and question counts

Part

Pages

Worked illustrations

Solved questions

Practice questions

Cover and index

1–3 (3)

—

—

—

Unit 1: Project Identification Analysis

4–13 (10)

1

3

10

Unit 2: Market and Technical Analysis, Project Costing and Finance

14–28 (15)

5

3

12

Unit 3: Project Appraisal and Risk Analysis

29–41 (13)

11

3

12

Unit 4: Network Techniques, Project Management and Review

42–53 (12)

4

3

12

Final page to confirm

54 (1; content not identified)

—

—

—

Listed book total

54

21

12

46

MFM 204 printed notes: page allocation and question counts

Part

Cover and index

Pages

1–3 (3)

Worked illustrations

—

Solved questions

—

Practice questions

—

Pages

4–13 (10)

Worked illustrations

1

Solved questions

3

Practice questions

10

Pages

14–28 (15)

Worked illustrations

5

Solved questions

3

Practice questions

12

Pages

29–41 (13)

Worked illustrations

11

Solved questions

3

Practice questions

12

Pages

42–53 (12)

Worked illustrations

4

Solved questions

3

Practice questions

12

Part

Final page to confirm

Pages

54 (1; content not identified)

Worked illustrations

—

Solved questions

—

Practice questions

—

Part

Listed book total

Pages

54

Worked illustrations

21

Solved questions

12

Practice questions

46

The supplied mapping accounts for 50 unit-content pages, three introductory pages and one final page whose content has not been specified. The full book is offered in print, not as a complete downloadable PDF. Price and payment details are shared through WhatsApp.

For exam revision, Units 3 and 4 together contain 15 of the book's 21 worked numerical illustrations.

Delivery: within 5 to 7 days at most; the exact time may vary with your location.

Order the MFM 204 notes book on WhatsApp (4 units, 54 pages)

Unnati Educations is an independent education provider based in Vikaspuri, Delhi. We are not affiliated with, authorised by, or endorsed by Guru Gobind Singh Indraprastha University (GGSIPU). 'GGSIPU' and 'IPU' are used only to describe the syllabus our notes follow. For official information, visit ipu.ac.in.

Ready for the full notes?

Discuss coverage and delivery with our team.